West Philadelphia High School

New construction: West Philadelphia High School; Brinjac Engineering

08/09/2012


The exterior rendering of West Philadelphia High School is shown. Courtesy: Kelly/Maiello Architects & Planners (Click to enlarge)Project name: West Philadelphia High School

Location: Philadelphia, Pa.

Firm name: Brinjac Engineering

Project type, building type: New construction, school (K-12)

Project duration: 6.5 years

Project completion date: April 3, 2007

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $15 million

Engineering challenges

There were two major engineering challenges. The first was finding a balance between the owner’s standards, maintenance requirements, and budget constraints against obtaining LEED certification. The second was the acoustical performance levels between the indoor equipment noise and the outdoor noise levels from the neighboring elevated train (El train).

Solutions

In both cases the design group was able to overcome the challenges and the project obtained U.S. Green Building Council LEED Gold certification.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Designing for energy efficiency; Understanding and applying NFPA 101 for mission critical facilities; Integrating commissioning and testing for fire alarm systems; Optimizing unitary pumping solutions
Economics of HVAC systems; NFPA 110-2016; Designing and choosing modular data centers
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
click me