SEARCH Archives
Loading
Sponsored by:

Video: Arc Flash Training Overview

In this video, the dangers of arc flash explosions are documented and explored.

10/12/2010

Flash is required!

In this video sponsored by Westex, the dangers of arc flash explosions are documented and explored. 

Topics covered in the video include:

  • Extensive arc flash testing
  • Arc flash safety
  • NFPA 70E compliance
  • Comfort and Safety

For more information about arc flash safety and testing, check out the following resources:

Webcast: Arc Flash University Part 3: NFPA 70E 2009

This session presents an overview of the NFPA 70E 2009 Standard for Electrical Safety in the Workplace and the requirements of the standards, which are intended to better protect electrical workers from injury when they work on energized electrical equipment.

Visit Westex for more information about flame retardant fabrics and arc flash safety.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity
About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.