UPS efficiency and LEED certification

LEED certification for a project demonstrates a dedication to sustainability and energy efficiency.

06/25/2012


The U.S. Green Building Council (USGBC) LEED rating system is a voluntary national standard for green buildings. LEED certification for a project demonstrates a dedication to sustainability and energy efficiency. LEED certification requires a certain number of points for each recognized level (see “LEED certification levels”).

It is generally recognized that a majority of the LEED points toward project certification can be obtained through site selection, as well as civil, architectural, and mechanical systems. However, in some situations, the last few points required for project certification can be very expensive. An innovative and LEED-experienced data center electrical contractor can be a very important team member on most LEED projects. The points obtained through innovative data center design and construction practices can help maximize energy efficiency.

The electrical contractor should be an interactive LEED team member. It is beneficial for the entire project to have a data center contractor with LEED engineering knowledge and experience. The data center contractor must apply LEED protocols during construction at the job site.

LEED certification requires innovative design input from all design and construction entities. Through selection of energy-efficient electrical UPS systems, the electrical contractor can help generate several points toward project certification.

Energy and atmosphere credit No. 1: optimized energy performance is USGBC’s most important LEED credit as reflected in the number of available points. Projects earn points based on their Energy Star score, which is derived from their actual energy use during the performance period. Energy-efficient buildings can exceed energy code requirements through efficient mechanical, electrical, and lighting system design. If the building’s energy use is less than the energy code by a minimum of 12% for new buildings or 8% for existing buildings, the project can obtain LEED points (see “Optimized energy performance scoring chart”).

The prerequisite for the minimum energy performance category is to meet the minimum energy efficiency level of either ASHREA/IESNA 90.1 or local energy codes, whichever is more stringent.


Lane is president and CEO of Lane Coburn & Assoc. He is a member of the Consulting-Specifying Engineer editorial advisory board.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
2014 Product of the Year finalists: Vote now; Boiler systems; Indirect cooling; Integrating lighting, HVAC
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.