University Health System—Trauma Tower, Central Plant Expansion

New construction: University Health System—Trauma Tower and Central Plant Expansion; TMAD Taylor and Gaines (TTG)

08/09/2012


University Health System, Trauma Tower and Central Plant Expansion.Project name: University Health System—Trauma Tower and Central Plant Expansion

Location: San Antonio, Texas

Firm name: TMAD Taylor and Gaines (TTG)

Project type, building type: New construction, hospital

Project duration: 4.5 years

Project completion date: January, 2014

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $150 million

Engineering challenges

One of the challenges encountered was to deliver all air handling unit condensate to the cooling tower as makeup water.

Solutions

We overcame this challenge by providing collection tanks on each level of the hospital that contained air units. A separate line was then routed to the common cooling tower basin from each collection tank. This allowed the use of existing elevation to move the water to the cooling towers basin, without pumps and without overflowing air units or tanks at lower levels.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating electrical and HVAC for energy efficiency; Mixed-use buildings; ASHRAE 90.4; Wireless fire alarms assessment and challenges
integrated building networks, NFPA 99, recover waste heat, chilled water systems, Internet of Things, BAS controls
40 Under 40; Performance-based design; Clean agent fire suppression; NFPA 92; Future of commissioning; Successful project management principles
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me