Smoke control system guidelines added

Guideline 1.5-2012, The Commissioning Process for Smoke Control Systems, describes the technical requirements of the commissioning process described in ASHRAE Guideline 0-2005.

09/14/2012


ASHRAE has added to its suite of commissioning guidance to ensure buildings and systems operate as intended with a new guideline on commissioning for smoke control systems.

Guideline 1.5-2012, The Commissioning Process for Smoke Control Systems, describes the technical requirements of the commissioning process described in ASHRAE Guideline 0-2005, The Commissioning Process, to verify that the smoke control system achieves the owner’s project requirements.

The guideline includes annexes that are based on actual project experience and current practice and illustrate application of the commissioning process for smoke control systems and components. It builds upon the concepts of Guideline 5, Commissioning Smoke Management System, and replaces it.

“Due to the integration and interdependency of systems, a performance problem in one system can result in less than optimal performance in others,” Paul Turnbull, chair of the committee that wrote the guideline, said. “Although Guideline 1.5 focuses on smoke control systems, a successful building commissioning process validates the interoperability between all building systems. When smoke control is the primary focus of the commissioning process, coordination among disciplines is essential for success.”

Other commissioning guidance from ASHRAE includes Guideline 0-2005, The Commissioning Process, which contains general requirements for the commissioning process of all building systems; and Guideline 1.1-2007, HVAC&R Technical Requirements for the Commissioning Process, which contains specific requirements for commissioning HVAC&R systems in Guideline 0-2005 that are unique to HVAC&R systems.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
2016 Product of the Year Finalists: Vote now; Data center Q&A; LED codes; Smart buildings
Fire pump power system design: How to design safe, reliable fire pump power service; Water management in commercial buildings; Emergency egress, illumination
Pump technology design: Selecting pumps and pipes; Class A office buildings; NFPA 101-2015; ASHRAE 90.1 updates; Motors, drives, and HVAC efficiency
Designing generator systems; Using online commissioning tools; Selective coordination best practices
Understanding transfer switch operation; Coordinating protective devices; Analyzing NEC 2014 changes; Cooling data centers
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.