Smartest Building in America challenge

Siemens Industry's Smartest Building in America challenge has returned to recognize the innovative implementation of APOGEE and TALON building automation systems and the role these systems plan in making buildings more energy efficient.

05/21/2011


Siemens Industry Inc. has announced the 2011 Smartest Building in America challenge. Open to facilities that use Siemens operating systems, the Smartest Building in America challenge launched on May 1 and continues through Aug. 1, 2011. The challenge recognizes the innovative implementation of APOGEE or TALON building automation systems and the role these systems play in making buildings smarter, efficient and more sustainable.

Last year’s winners included the Duke Energy Center, Charlotte, N.C.; the Iowa Central Community College Biotechnology and Health Science Building, Fort Dodge, Iowa; Alaska’s Cold Climate Housing Research Center, Fairbanks, Alaska; and the Rasmussen Building at Grandview University, Des Moines, Iowa.

Participants are asked to submit brief videos that explain why their buildings are the smartest in America. To view more information on rules and prizes or to submit an entry form and video visit: www.smartestbuildinginamerica.com.

- Edited by Amanda McLeman, Consulting-Specifying Engineer, www.csemag.com



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Control noise, vibration in building design: Tackling acoustics and design issues; High-performance building design; NFPA 99; Combined heat, power
40 Under 40; Stand-alone medical buildings; NFPA 92; Specialty fire suppression; Applying 90.1 in lighting design
2016 Product of the Year Finalists: Vote now; Data center Q&A; LED codes; Smart buildings
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
Understanding transfer switch operation; Coordinating protective devices; Analyzing NEC 2014 changes; Cooling data centers
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me