Silicon Valley Contributes to Lunar Prospector

In the first NASA-supported mission to the moon in 25 years, 26 Silicon Valley firms together created the recently launched Lunar Prospector spacecraft. Led by Lockheed Martin Missiles & Space, the firms created the first peer-reviewed, competitively selected mission in NASA's Discovery Series.

02/01/1998


In the first NASA-supported mission to the moon in 25 years, 26 Silicon Valley firms together created the recently launched Lunar Prospector spacecraft. Led by Lockheed Martin Missiles & Space, the firms created the first peer-reviewed, competitively selected mission in NASA's Discovery Series. Lunar Prospector's overall program budget is $63 million. By comparison, the first lunar orbiter in 1966 would have cost $266 million in 1997 dollars.

Participating companies included Hewlett-Packard (Palo Alto, Calif.), which contributed Lunar Prospector's electrical test set, and Motion Industries Inc. (Santa Clara, Calif.), which contributed miniature precision bearings and actuators.

Launched in late November 1997, the 660 lb Lunar Prospector is spending a year in a polar orbit mapping the moon's geological features and searching for water and other resources. Its instruments will also collect data about the moon's gravity and magnetic fields, and check whether gases are being released at the surface.

For more information, visit www.controleng.com/info .





No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating electrical and HVAC for energy efficiency; Mixed-use buildings; ASHRAE 90.4; Wireless fire alarms assessment and challenges
integrated building networks, NFPA 99, recover waste heat, chilled water systems, Internet of Things, BAS controls
40 Under 40; Performance-based design; Clean agent fire suppression; NFPA 92; Future of commissioning; Successful project management principles
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me