Selective coordination in elevators is required when more than one elevator is supplied by a common feeder.


Figure 2: The graph indicates a 200 amp breaker in the main distribution gear feeding an elevator control panel with a 100 amp and a 70 amp fuse. The study must ensure that the two fuses will trip in a fault condition in any one of the separate elevator fSelective coordination is required when more than one elevator is supplied by a common feeder, per NEC Article 620-62. Figure 2 shows an example of a coordination study illustrating the feeder breaker overcurrent protection, the elevator fuse overcurrent protection, and the elevator motor start-up curves.


Keith Lane is president and CEO of Lane Coburn & Assocs. He is a member of the Consulting-Specifying Engineer editorial advisory board, and was a 2008 40 Under 40 award winner. Lane has more than 20 years of experience designing, commissioning, and optimizing mission critical facilities.

- See how selective coordination studies are used in mission critical environments below.

SIVA , AL, India, 09/08/13 03:31 AM:


I suggest for independant supply from diffrent feeders with correct rating

This kaind of articles really help.

Thank You.
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Salary survey: How much are you worth?; Dedicated outdoor air systems; Energy models and lighting
Fire, life safety in schools; Fire protection codes; Detection, suppression, and notification; 2015 Commissioning Giants; Emergency and standby power in hospitals
HVAC and building envelope: Efficient, effective systems; Designing fire sprinkler systems; Wireless controls in buildings; 2015 Product of the Year winners
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Implementing microgrids: Controlling campus power generation; Understanding cogeneration systems; Evaluating UPS system efficiency; Driving data center PUE, efficiency
Optimizing genset sizing; How the Internet of Things affects the data center; Increasing transformer efficiency; Standby vs. emergency power in mission critical facilities
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.