Schneider Electric fires up 60 kW PV array on cold winter day

Schneider Electric launches 60 kW dc photovoltaic (PV) power array at company's North American headquarters in Palatine, Ill. News and photos!

12/14/2009


 

Schneider Electric launched its 60 kW dc PV array on Dec. 10 at its Palatine, Ill., headquarters building. The outdoor air temperature was 5 F and winds were blowing at 10 mph. Skies were blue, however, and the panel was generating about 40 kW dc of power. Overall, the the array will reduce electric usage at its North America headquarters facility by an estimated 2% to 3% annually, company officials said, as they powered up the installation.

The array is a configuration of 29 "sunflowers;" a single sunflower has eight PV panels mounted on a pole. Schneider's installation is the largest of its kind in Illinois. The 60 kW dc array provides about 50 kW ac power due to line and inverter losses.

While the project would cost others about $750,000, Schneider Electric's cost was about $550,000 (with company discount on switchgear, inverter, and related equipment). With local and federal incentives, payback is estimated at 10 years. There were no utility rebates offered by Commonwealth Edison (ComEd).

Here's the full story by Mark Hoske , editor-in-chief, Control Engineering . Photos by Hoske and Michael Ivanovich, editor-ion-chief, Consulting-Specifying Engineer are included.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Smoke control: Designing for proper ventilation; Smart Grid Standard 201P; Commissioning HVAC systems; Boilers and boiler systems
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
Cannon Design’s blog is a place for the many voices of the firm to share thoughts and news related to current projects...
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.