PV reflectivity safe for airports

Glare analysis performed via simulated environment for proposed PV array near airport.

07/06/2011


In April 2010, a 5-MW photovoltaic (PV) array was proposed at a 70-acre site located 1 mile south of Newquay Airport in Cornwall, England. The PV array will have a direct grid connection and export energy to the local utility, Western Power Distribution, and is slated for completion in March 2012. However, airport officials expressed concern about the possibility of sunlight reflecting off the PV panels and creating glare conditions for pilots and air traffic controllers in the tower.

The city council of Cornwall contracted Parsons Brinckerhoff (PB) to conduct a glare analysis.

Creating a geometric model

The PB team analyzed glare conditions quantitatively by generating a simulated environment with 3-D CAD and BIM software. Because the PV system had not yet been designed by a third party, PB’s first task was to estimate the physical size and orientation of the array. The PV designer had decided on a 21-degree tilt-angle fixed toward the south. Given this tilt-angle, PB estimated the physical layout necessary to generate 5 MW and situated it within the proposed boundary.

One significant challenge was simulating sunlight reflections based on the sun’s daily path and its angle changes throughout the year, then incorporating the view from a moving aircraft. The analysis was simplified by selecting static viewer perspectives for the pilot along each runway approach from a specified distance. A third viewer perspective was added for the control tower. Using energy simulation software, the sun’s path through the sky was simulated for one day per month for each month. The project aimed to detect if and when direct glare would be observed from any of the three perspectives. PB generated animations for each perspective for all 12 months to demonstrate the sun’s path and reveal glare occurrences.

To detect glare in the simulations, the PV panels were modeled as mirrors with 100% reflectivity. This was an exercise purely in the geometry between the sun, the PV array, and the viewer perspectives. The model and animations revealed that direct glare would be encountered at one of the viewer perspectives, the approach to runway 30, in the evening during August (see Figure 1). Because the aircraft flies much faster than the sun travels through the sky, the pilot would fly through this glare and experience it only for an instant.

Figure 1: This screenshot shows direct glare from the PV array observed on a Runway 30 approach on an August evening. Courtesy: Parsons Brickerhoff

Analyzing PV reflectivity

Another important factor in determining the effect of glare from PV arrays is to determine the intensity of light reflected from PV panels. While the mirrors used in the computer model had 100% reflectivity, PV panels are observed to reflect very little light.

The Technical Guidance for Evaluating Selected Solar Technologies on Airports report stated that several PV installations at or near airports had not created glare conditions and that PV material only reflected approximately 2% of incident sunlight, which is less than bare soil. Soon after the FAA guidance was published, it was adopted by the U.K. Civil Aviation Authority (CAA). Due to the FAA’s reliable data, PB felt comfortable concluding that even if the geometry did reveal a direct glare occurrence, it would be so minimal that it would not cause a problem.

The short-lived glare and the minimal intensity of light reflected off PV material led the PB team to conclude that glare would not have a negative effect on airport operations.

If glare or reflection from a PV array is a concern, the following items should be included in the project requirements:

  • Rolled glass for diffuse reflection
  • Anti-reflective coating
  • Product demonstration or mock-up arranged with stakeholders.

EXCLUSIVE: Watch this glare simulation video.

Roseman is a supervising electrical engineer and certified project manager with Parsons Brinckerhoff. He is experienced in lighting and power distribution for various types of buildings, parking structures, and streetscapes, as well as aviation lighting. He has been with PB for 12 years.

Click to view a glare simulation clip. Courtesy: Bruce Ross Associates Inc.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Smoke control: Designing for proper ventilation; Smart Grid Standard 201P; Commissioning HVAC systems; Boilers and boiler systems
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.