Power Distribution Units

09/16/2010


The APC Metered Rack PDUs help IT and facilities managers more effectively and productively manage power capacity and functionality for critical network, server, and data center equipment.   APC’s new Rack PDUs solve rack-level power needs while incorporating new intelligent features like real power measurement and environmental monitoring all in a space-efficient zero-U form factor – the most shallow depth form factor in the industry. The APC Metered Rack PDU series provides advanced, real-time remote monitoring of connected loads with user-defined alarms to warn of potential circuit overloads before critical IT failures occur, enabling IT managers to proactively monitor and resolve issues.

The APC Next Generation platform of intelligent rack PDUs sets a new industry standard with the ultra low profile design for improved customer access to critical IT equipment and space savings for improved rack-enclosure cable management. The APC Next Generation Metered Rack Power Distribution Units (PDUs) provide active power metering at device, phase, and breaker bank levels for overload protection, capacity planning purposes, and energy efficiency initiatives. User-defined alarm thresholds mitigate risk with real-time local and remote alerts to warn of potential circuit overloads. Metered Rack PDUs provide power utilization data to allow Data Center Managers to make informed decisions on load balancing and right sizing IT environments to lower total cost of ownership. Users can access and configure Metered Rack PDUs through secure Web, SNMP, or Telnet Interfaces, which are complimented by APC Centralized Management platforms using InfraStruxure Central, Operations, Capacity, and Energy Efficiency.  Next Generation Metered Rack PDUs include active power metering and remote alarming with volts, amps, real power (kW), and energy (kWh) measurements. Other features include:

  • Integrated user interactive LCD display interface, replaceable for future upgrades, allows for real-time equipment connectivity & load balancing guidance and provides optional temperature and humidity monitoring with user defined alarms.
  • New ultra low profile, space saving, hydraulic-magnetic breakers maximize IT equipment space and provide the strongest over-current protection available for high temperature rack enclosure environments.  
  • Next Generation Rack PDUs feature locking IEC receptacles and when used with the new locking IEC jumper cords enable the use of an exclusive, easy-to-use and space saving cord retention method, eliminating the need for bulky cable management brackets.
  • Environmental monitoring port allows for temperature and/or humidity monitoring and remote alarming to warn of critical situations.


No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity
About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.