SEARCH Archives
Loading
Sponsored by:

Poke-thru device

Pre-pour sleeves can save installation time for the Evolution series of poke-thru devices from Wiremold/Legrand. Designed for 6-in. or 8-in. holes in the slab, contractors can use the PVC sleeves attached to the structural decking instead of core-drilling holes after the slab is poured. Each unit includes three attachment legs, thumb screws, and end caps.

10/01/2009


 

Pre-pour sleeves can save installation time for the Evolution series of poke-thru devices from Wiremold/Legrand. Designed for 6-in. or 8-in. holes in the slab, contractors can use the PVC sleeves attached to the structural decking instead of core-drilling holes after the slab is poured. Each unit includes three attachment legs, thumb screws, and end caps. The devices are UL-fire-classified to maintain the fire rating of the floor slab for up to 2 hr.

 

www.legrand.com #11

 



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity
About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.