Manufacturers’ focus on data centers: Electrical and power

Designing efficient and effective data centers and mission critical facilities is a top priority for consulting engineers. Three manufacturers share information about their company’s products and solutions.

01/21/2013


Participants

  • John Collins, Global Segment Director, Data Centers, Eaton Corp., Raleigh-Durham, N.C.
  • Jim Dagley, Vice President, Channel Marketing & Strategy, Johnson Controls Inc., Milwaukee, Wis. 
  • John Kovach, Global Head of Data Center Initiatives, Siemens, Buffalo Grove, Ill.

Electrical/Power

CSE: What PUE (power usage effectiveness) goals are engineers requiring, and what tactics are you using to accomplish this?

Collins: PUE required by our engineering customers depends on the client they are ultimately trying to serve and the nature of the project. Some cloud providers and Web 2.0 companies are trying to achieve PUE of less than 1.1. Enterprise customers often strive for PUE between 1.3 and 1.6 for new data center construction, and understand the PUE of a retrofit may be slightly higher depending on existing constraints. Eaton’s overall approach to PUE is to first take a holistic view of the data center design and a deep understanding of how the different electrical and mechanical subsystems interact before recommending how the facility or engineering plans can be modified for optimum performance.

Dagley: PUE and return on investment (ROI) are the two most important acronyms in the data center industry. You must optimize both in any new construction or data center retrofit. Our research shows that 60% of the marketplace is operating at a PUE of 2.0 or greater, and that isn’t going to cut it anymore. Through proper power and cooling, integrations, lifecycle approaches, and modular data center design, we are approaching a PUE of nearly 1.0.

Kovach: We are definitely seeing more end users publishing their PUEs. There will always be that push to get PUEs down as much as possible, but there is a lack of true consistency on exactly what impacts PUE; for example, is a cooling fan on a server considered an IT load or a facility load? Efficient cooling of assets and reliable, intelligent power distribution systems are critical components in driving better PUEs at any facility—existing or greenfield. These are all part of Siemens’ core competencies. Engineers not only want to understand how to best design BMS, energy power monitoring systems (EPMS), and data center infrastructure management (DCIM) systems and solutions that vendors like Siemens provide, but also how their clients are using these systems to more effectively operate their facilities.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity
About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.