The Sao Salvador Poultry Processing Plant, better known as SuperFrango (SuperChicken), is a pioneer in modern poultry-raising systems in Brazil’s central region.

10/01/2010


The Sao Salvador Poultry Processing Plant, better known as SuperFrango (SuperChicken), is a pioneer in modern poultry-raising systems in Brazil’s central region. Headquartered in Itaberai, Brazil, the plant was founded in 1970 through a partnership between friends Carlos Vieira da Cunha and Jose Carlos de Souza. SuperFrango routinely invests in new technology to improve operational stability, which was demonstrated during the recent Pintos de Corte incubator.

After 5 years of planning, design, and construction, along with a $12.6 million investment, SuperFrango opened its new slightly larger than 150,000-sq-ft facility on more than 1 million sq-ft of space. The plant provides jobs for roughly 1,400 people, processes more than 180,000 chickens daily, and produces more than 10.7 million eggs monthly. As with most industrial facilities, SuperFrango needs reliable, economical power. Utility power at the site is provided based on “time-of-day” rates, so economics dictated a design that provides a seamless transfer between utility and generator plant. A prime power generation and ramping power transfer system was the solution SuperFrango sought. SuperFrango partnered with Cummins Power Generation, and the installation began in April 2006 with a delivery made in November 2008.

The system Cummins provided included five Cummins model C400D6 456 kWA diesel generator sets driven by Cummins NTA855G5 engines. The generator sets also include alternators and PowerCommand digital paralleling controls and switchgear manufactured by Cummins. The Cummins peak power system helps SuperFrango meet its electricity needs by monitoring utility power, starting and paralleling generators when and if power fails, and transferring from the utility to generators as needed. Depending on the time of day, the system will automatically start the generators, parallel them to the utility, and control their power output to minimize load and utility costs.

The generators provided can operate the entire facility. When the time comes to shut the generators down, the system synchronizes and parallels the generators to the utility, transfers the load back to the utility, disconnects and cools the generators, and leaves them ready to start again. By operating the standby power system in prime power mode at peak hours, SuperFrango achieves savings of 30% during the 3 hours of the day when utility power costs are the highest.

Information provided by Cummins Power Generation



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Smoke control: Designing for proper ventilation; Smart Grid Standard 201P; Commissioning HVAC systems; Boilers and boiler systems
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
Cannon Design’s blog is a place for the many voices of the firm to share thoughts and news related to current projects...
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.