Machine Safety: Thinking of bypassing an e-stop? Have you talked to an attorney?

Is it ever permissible to install a bypass switch or to disable an e-stop? For some reason, some Internet “safety forums” have had this continuing discussion. See the one requirement consistently missing from these international discussions. And ask these 4 questions.

10/25/2013


Jokab Safety, part of ABB, showed a giant e-stop at a Pack Expo show a few years ago. CFE Media photo

Is it ever permissible to install a bypass switch or to disable an e-stop? For some reason, a few “safety forums” on the Internet have had this discussion going for months. These are international discussions, yet one requirement in the analysis is missing consistently.

On this subject, can you actually imagine several engineers corroborating and contributing argumentation on how to install and why not to install a bypass switch on an e-stop circuit. The discussions veer off into SIL levels, PL (Performance Levels), MTTFd (Mean Time To Fail dangerous), B10 values, and more. Sometimes there’s even a brief discussion about the Machinery Directive or different standards like IEC 61508-1, IEC 62061, ISO 13849-1, and IEC 60204-1, and different ways to derive calculations based on different interpretations.

Just when it looks like the discussion is about to arrive at a conclusion someone asks something like, "Well, just what is it you’re trying to accomplish? And, why is this question on the table?" Then a strategy discussion launches on why and how a safety function can be bypassed.

So, what is the one requirement not even hinted at so far? That’s right, the risk assessment!

Why is it that these discussions can go on for months back and forth and no one interjects the "risk assessment" discussion?

4 questions to ask if you're thinking of bypassing an e-stop

Here are some of the questions I can think of related to this topic:

1. Does the current risk assessment allow for a given hazard to become unmitigated?

2. Does your company safety policy allow for a given hazard to become unmitigated?

3. Do machine safety application standards like IEC 60204-1, ISO 13849-1, or in the U.S. – NFPA 79 allow e-stops to be by-passed or disabled?

4. Is there any established and documented compliant basis whereby it is okay to bypass an e-stop?

Well, if the answers to these questions are generally, "NO," then, why would anyone even consider designing and engineering an e-stop bypass? 

Additionally, I’d want to know if the individual asking the original question is talking about an application based on international standards or domestic U.S. standards. The answer to that question might then promote discussions involving risk assessment, that is: ISO 12100 versus ANSI B10.0. I’m sure you get the point!

J.B. Titus, CFSE

Has this presented you with any new perspectives? Do you have some specific topic or interest that we could cover in future blog posts? Add your comments or thoughts to the discussion by submitting your ideas, experiences, and challenges in the comments section below.

Also see additional posts linked at the bottom of this article.

Related articles:

Calculation of MTTFd for a pushbutton

Machine Safety – consequences of not performing risk assessments!

Machine Safety – does a risk assessment need to be updated for a minor modification to a machine?

Machine Guarding & The Hierarchy of Measures for Hazard Mitigation



Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Integrating electrical and HVAC for energy efficiency; Mixed-use buildings; ASHRAE 90.4; Wireless fire alarms assessment and challenges
Integrated building networks, NFPA 99, recover waste heat, chilled water systems, Internet of Things, BAS controls
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Integrating electrical and HVAC for energy efficiency; Mixed-use buildings; ASHRAE 90.4; Wireless fire alarms assessment and challenges
Integrated building networks, NFPA 99, recover waste heat, chilled water systems, Internet of Things, BAS controls
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me