Lockheed Building 245—Materials, Sciences

New construction: Lockheed Building 245—Materials and Sciences; Alfa Tech

08/09/2012


This rendering is of the main building. Courtesy: DGA Architect (Click to enlarge)Project name: Lockheed Building 245—Materials and Sciences

Location: Palo Alto, Calif.

Firm name: Alfa Tech

Project type, building type: New construction, research/lab/high-tech

Project duration: 2 years

Project completion date: June 29, 2009

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $2.5 million

Engineering challenges

One of the biggest challenges was providing flexible lab layouts, including ventilation, which could be interchanged as program requirements changed. The lab portion of the project required the utilization of 100% outside air for makeup to the lab fume hoods. So providing the required ventilation, meeting U.S. Green Building Council LEED requirements, and staying within budget proved to be challenges.

Solutions

To be responsive to changing program requirements, basic lab modules were designed, with additional utilities available in the utility corridor at all labs, which separate groups of lab modules. Each lab module was provided with independent supply and exhaust airshafts within each lab module. Variable volume lab exhaust systems were connected to fume hoods and lab general exhaust. The supply air was controlled to track the variable volume exhaust and minimize energy required to condition the outside air.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Smoke control: Designing for proper ventilation; Smart Grid Standard 201P; Commissioning HVAC systems; Boilers and boiler systems
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.