Integrating BAS, electrical systems

Integrating electrical systems with BAS can promote operational efficiencies, optimize maintenance staff effectiveness, and leverage fault diagnostics.

10/03/2013


Figure 1: BAS user interface screens such as the dashboard shown in the illustration can provide user-friendly electrical system data visualization. Courtesy: DGLux by DGLogikOwners of high-performance buildings expect engineers, manufacturers, and building system installers to work together to increase the performance of the building’s systems. However, superior performance typically is associated with increased complexity and cost. 

Modern microprocessor-based equipment is replacing electromechanical devices. Industrial networks connect equipment and systems. Sensors provide feedback to measure results and enable enhanced control and functionality. Enhancing, connecting, and integrating industrial systems with a building’s control platform allows engineers to exceed the high-performance building owners’ expectations. 

BAS has become a ubiquitous feature of the modern commercial building, providing a window into the complex operation of building mechanical systems and therefore allowing operators to do their jobs more effectively. Modern BAS systems are also well equipped—out of the box or with very little extra cost—to speak the standards-based network protocols, such as Modbus, found in many electrical systems. The addition of network wiring or wireless communications can enable easy integration. By consolidating electrical and mechanical system monitoring into a single unified BAS platform, the full potential of electrical equipment and systems can be harnessed, unlocking new opportunities for high-performance strategies. 

New opportunities

In addition to managing the building mechanical systems, the modern BAS can leverage many of its features, such as trending, alarming, and web-based graphics, to monitor the electrical systems as well (see Figure 1). Integration can also employ a building operator’s existing experience and training to enable more efficient building management. 

Integrating a building’s electrical systems into its BAS can unlock new opportunities for high performance. BAS integration opportunities include expanding operational efficiencies, coordinating historical data, optimizing maintenance staff effectiveness, and leveraging fault diagnostics. 

Expanding operational efficiencies: Having data from each system on a single platform allows building operators to draw conclusions to further implement energy efficient strategies that can’t easily be achieved with stand-alone systems. By simultaneously tracking and analyzing both mechanical and electrical systems through benchmarking (i.e., comparing initially installed amperage to current amperage), operational staff can take corrective action if and when equipment efficiency drops. Determining the best way to reduce peak demand energy charges becomes easier when these systems can be viewed from one platform. Reducing building loads in reaction to demand response requests becomes simpler when actions can be executed from a single location. Understanding these tasks in real time allows building operators to set and meet efficiency goals while reducing energy costs. 

Many modern BAS implementations include a real-time interface to a CMMS or similar facility management software that manages equipment maintenance and triggers work tickets based on operating parameters such as equipment run time or equipment faults. Leveraging the software for electrical systems via a BAS interface can enhance operator attention to electrical equipment maintenance.

Coordinating historical data: To manage and improve any process, a data baseline is imperative. One cannot know of a potential issue if the real-time data cannot be compared to how equipment had been operating prior to the problem. The opportunity to review historical data from power meters and be able to pull charts and graphs from multiple systems over time will enhance an operator’s ability to investigate and solve problems. 

Optimizing maintenance staff effectiveness: Moving electrical system control and monitoring to the BAS will instantaneously generate new ways to analyze building data, including the opportunity to meet and set more effective operation and maintenance goals. When the MEP systems are tied together, the chief engineer can spend more time doing preventive maintenance than reactive problem solving, which typically reduces maintenance costs. BAS integration for monitoring electrical systems also allows staff to be alerted immediately of potential power issues, such as providing a warning of a forthcoming overload on the power distribution system that could take out a critical life safety system or cause significant losses due to extended downtime. 

Additionally, staff effectiveness will naturally improve when one piece of software does it all, as operators are likely to remember how to manage the system as part of their daily routine and will remain trained on it over time. Furthermore, when operators are familiar with the BAS, they are more likely to learn and use higher-level functions and analyses. 

Leveraging fault diagnostics: By interfacing electrical systems into a BAS, fault diagnostics become possible. The more data that is acquired, stored, and analyzed, the easier it is to write meaningful fault algorithms. These algorithms teach the BAS to indicate when a piece of equipment is about to break or if it is not running at optimal condition by comparing values of different parameters based on historical data. For example, if one system is using more electricity than it did yesterday to operate under identical conditions, the BAS can alert the operator to investigate a possible equipment issue or point to problematic settings.


<< First < Previous 1 2 Next > Last >>

No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Smoke control: Designing for proper ventilation; Smart Grid Standard 201P; Commissioning HVAC systems; Boilers and boiler systems
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
Cannon Design’s blog is a place for the many voices of the firm to share thoughts and news related to current projects...
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.