SEARCH Archives
Loading
Sponsored by:

Innovating our way through the recession

One of the best things about being in the engineering field is that we get to witness new technologies and processes as soon as they're on the market--new products, groundbreaking projects, and unique engineering solutions.

By Amara Rozgus, Editor in Chief

06/27/2012


A difficult--and yet rewarding--outcome of this recession has been the boom of small engineering firms and other businesses. Individuals, once cut loose from larger firms that have trimmed back on the workforce, have launched their own firms--a dream they may have never considered unless pushed. By forging their own paths, engineers have been forced to succeed independently. Small firms have had to expand their capabilities by adding new services or refocusing their business. Even large firms, seemingly untouched by the recession, have repositioned themselves, bringing in new business development teams or expanding services to include previously untouched markets. Kudos to those firms who are staying competitive and innovative in our industry.

One of the best things about being in the engineering field is that we get to witness new technologies and processes as soon as they're on the market--new products, groundbreaking projects, and unique engineering solutions.

The engineering firms that fill these pages with technical articles each month are at the forefront of innovation. For example, the cover story on emergency lighting discusses the most important issues in life safety and lighting with special coverage that includes relevant new products.

In another article, best practices for documenting ASHRAE Standard 90.1 compliance are detailed. While many of these tips seem obvious, they are frequently overlooked in the documentation phase, so they remain vital to any successful project with ambitions to comply with and exceed ASHRAE Standard 90.1.

To me, innovation means staying ahead of the competition, making decisions quickly, thinking differently, and setting the curve, not responding to it. I've been fortunate in my career to work at innovative firms--CFE Media LLC (the publisher of this publication and others in the engineering field) is one of these cutting-edge companies. While my response time may sometimes seem slow to you, I can assure you that my brain is moving at about 100 mph--along with the brains of our staff. Our company is celebrating its 2-year anniversary with the June 2012 issue, and we got here by practicing innovation in action.

No matter the size of your firm, I'd like to hear about how you and your team have been innovative in the past year. We'll post these innovations online at www.csemag.com for everyone to learn from. Please send me your success stories, tips, tricks, best practices, photos, videos, etc. Keep it short, and we'll help you show off your own innovative spirit. Contact me at arozgus(at)cfemedia.com.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity
About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.