Hillshire Brands Headquarters

Existing building retrofit; Hillshire Brands Headquarters; Environmental Systems Design Inc.

08/15/2013


The Hillshire Brands’ 400 South Jefferson headquarters building is shown after renovations, which included new windows and a new roof. Courtesy: Environmental Systems DesignEngineering firm: Environmental Systems Design Inc.
2013 MEP Giants rank:
28
Project:
Hillshire Brands Headquarters
Address:
Chicago, United States
Building type:
Office
Project type:
Existing building retrofit
Engineering services:
Electrical/Power, Fire & Life Safety, HVAC
Project timeline:
January 2012 to December 2012
Engineering services budget:
$440,000
MEP budget: $440,000

Challenges

For the relocation of its headquarters office from the suburbs to the city of Chicago, Hillshire Brands was interested in the 300,000-sq-ft building at 400 South Jefferson. The building's owner, Sterling Bay, offered to finance a comprehensive repurposing of the existing industrial building, including a new roof, removal of walls, and new windows. The interiors of the build-out consisted of general office space and specialty areas such as test kitchens and conference space. However, the tight timeline was a challenge for the design team. The renovation schedule, from the start of design to Hillshire's move-in, was set for one year and required a fast-track design approach from all team members. ESD's MEP design team had 6 weeks to complete bid and permit documents, compared to the 8- to 10-week design schedule for a normal project of this scope and magnitude.

Solutions

To meet the aggressive schedule, the entirety of the project was modeled using BIM software. ESD used Revit MEP for the mechanical, electrical, and plumbing systems. The as-built building conditions had already been modeled in BIM software by the base building contractor, and both the interiors architect and lighting designer were using Revit Architecture. This gave the ESD design team the ability to coordinate with all trades and speed up the design process. The result was a complete, quality set of drawings within the tight timeframe. A comparison between photos of the constructed space and the construction documents produced in BIM demonstrates the accuracy produced by this comprehensive coordination and the overall success of the design team.

 



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
MEP Giants; MEP Annual Report; Mergers and acquisitions; Passive, active fire protection; LED retrofits; HVAC energy efficiency
Integrating electrical and HVAC systems; Tracking and conserving facility water use; Energy code advancements; The future of professional engineers
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me