This image shows the rendering of the Grand Valley State University project. Courtesy: Fishbeck, Thompson, Carr & HuberEngineering firm: Fishbeck, Thompson, Carr & Huber Inc.
2013 MEP Giants rank:
99
Project:
Grand Valley State University Science Lab, Classroom, and Office Building
Address:
Allendale, Mich., United States
Building type:
School (college, university)
Project type:
New construction
Engineering services:
Automation & Controls, Electrical/Power, HVAC, Lighting
Project timeline:
September 2011 to May 2015
Engineering services budget:
N/A
MEP budget: $964,304

Challenges and solutions

Understanding that lab buildings are typically large energy consumers, FTC&H tailored the mechanical design to utilize energy efficient systems and equipment. Some of the strategies included ventilation control through an active contaminant monitoring system, heat recovery/exchange between exhaust and fresh airstreams, occupancy control of terminal unit zone controls, and use of an auxiliary heat recovery chiller to efficiently handle simultaneous heating and cooling loads within the building.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Pump technology design: Selecting pumps and pipes; Class A office buildings; NFPA 101-2015; ASHRAE 90.1 updates; Motors, drives, and HVAC efficiency
Renewable power systems: Designing a net zero energy building; NFPA 37; Data center design; Lighting systems
Salary survey: How much are you worth?; Dedicated outdoor air systems; Energy models and lighting
Understanding transfer switch operation; Coordinating protective devices; Analyzing NEC 2014 changes; Cooling data centers
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Implementing microgrids: Controlling campus power generation; Understanding cogeneration systems; Evaluating UPS system efficiency; Driving data center PUE, efficiency
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.