SEARCH Archives
Loading
Sponsored by:

Energy recover ventilator

Greenheck Introduces Model ERCH-HP Energy Recovery Ventilator with Integral Water Source Heat Pump

08/12/2010


Greenheck’s Model ERCH-HP, a pre-engineered energy recovery ventilator incorporating an integral water source heat pump, provides an alternative for 100% outdoor air applications traditionally requiring custom-built equipment. The integral water source heat pump module is capable of conditioning outdoor air throughout the year as it includes both heating and cooling cycles, and coupling the heat pump with a total energy recovery wheel optimizes the unit efficiency. A dedicated outdoor air unit that provides ventilation for water source and geothermal applications, Model ERCH-HP features performance ranges from 1,000 to 10,000 cfm and 4 to 30 tons of mechanical cooling capacity. Model ERCH-HP is licensed to bear the AMCA Seal for Air Performance.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity
About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.