Energy audits, Cantor Art Center, Cecil H. Green West Library

System overhaul: Energy audits, Cantor Art Center and Cecil H. Green West Library; Salas O'Brien

08/09/2012


Cantor Art CenterProject name: Energy audits, Cantor Art Center and Cecil H. Green West Library

Location: Stanford, Calif.

Firm name: Salas O'Brien

Project type, building type: System overhaul, art/museum venue

Project duration: 4 years

Project completion date: Nov. 2012

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $367,800

Engineering challenges

The projects were challenging to implement in an operational facility. Each system had to be done one at a time so that the entire building was not affected. Because these historic buildings were not built in a humidity-controlled space, they dry out quickly once they are shut down and take a substantial amount of time (more than a week) to reach steady state again after start-up. This amplified the need to have redundancy in the new systems. Commissioning lasted several months as the new systems dynamics were learned by the in-house EMCS staff along with finding problems with existing equipment. This also was a cultural change given the learning of new sequences based on dew point instead of relative humidity.

Rodin Garden Cecil H. Green Library, image of exterior (Click to enlarge)Solutions

Stanford University, as part of its energy program, targeted two historic buildings for energy audits—Cantor Art Center and Cecil H. Green West Library—due to their relatively high energy usage when compared to other buildings. The audit focused on a few energy projects and was followed by design and construction of these projects. Now that these have been installed for a full year, through measurement and verification, savings of over $500,000/year have been proven. Mechanical systems in the buildings consisted of constant volume central station air handling units (AHUs) with fixed outside air, humidification, chilled water, and reheat coils. These AHUs were controlled by an energy management and control system (Rosemont). The control sequences were standard for this type of application. Modulating the chilled water coil and heating coil depending on demand controlled zone temperatures, and modulating the chilled water for dehumidification and the steam-to-steam humidifier for humidification controlled zone humidification. Trending of this data revealed hunting of both temperature and humidity.

Additional Information 

View a presentation from Salas O'Brien on the project



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Smoke control: Designing for proper ventilation; Smart Grid Standard 201P; Commissioning HVAC systems; Boilers and boiler systems
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.