Don't take duplication of your brilliance for granted

No question about it. Engineering Project Supervisor Fred Bailik's savvy was second-to-none in the plant engineering department. And that was exactly the problem.

01/01/1998


No question about it. Engineering Project Supervisor Fred Bailik's savvy was second-to-none in the plant engineering department. And that was exactly the problem.

Chief Engineer Milton Fore brought it to Plant Engineer Henry Lowe's attention one day. The evidence was summed up in an Employee Turnover Report distributed by Personnel.

"Take a look at this, Henry," Fore suggested.

The report listed employee resignations and terminations over a 3-yr period, broken down by department, section, and supervisor.

Lowe frowned. He gazed up at Fore. "Bailik?"

Fore nodded. What disturbed the Chief was clear. The number of quits of good people in Bailik's group were at least double those from any other group in the engineering department.

"What do you think?" Fore asked.

"This can't be ignored. Thanks for bringing it to my attention."

The situation called for a bit of investigation, Lowe decided. He selected five of the qualified professionals who had resigned from Bailik's group and picked up the telephone. By the second call, he had an idea of what Bailik's problem might be. By the fifth, he was convinced.

Question: Can you make a guess regarding Lowe's subsequent action?

Lowe's resolution: Lowe summoned Bailik to his office, offered him coffee, and made the visit as casual as possible.

"What's up?" Bailik asked.

"Small problem, which I think you can easily solve."

He showed Bailik the Turnover Report. It was the project leader's turn to frown. "What do you have in mind?"

Lowe smiled. "Nothing drastic. I think the excessive quits you've been experiencing might be nothing more than a case of a bright executive being too smart for his own good."

He told him about the phone calls he had made.

"The response followed a similar line. Dissatisfaction attributed to what I might categorize as communications gaps. First, I know how busy you are. Second, busy people often lose patience with things that take time. Third, bright people sometimes take it for granted that associates possess the same knowledge and understanding they do. Crediting a subordinate with similar savvy and smarts may be a compliment, but it can also be frustrating. In my opinion, it might make sense for you to slow down a bit in training people, giving assignments, and getting feedback to make sure the other guy is on the same wavelength."

Bailik's high brow was furrowed.

Lowe grinned. "It's not all that serious, Fred. But please give it some thought."





No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
2014 Product of the Year finalists: Vote now; Boiler systems; Indirect cooling; Integrating lighting, HVAC
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.