Office building clients demand sustainability, flexibility, and cost conservation in both new and existing buildings.


Michael F. Cooper, PE, LEED AP, is a Managing Principal at Harley Ellis Devereaux in Southfield, Mich. Courtesy: Harvey Ellis DevereauxKurt Karnatz, PE, CEM, LEED AP, HBDP, HFDP, is the President of Environmental Systems Design Inc. (ESD) in Chicago. Courtesy: ESDKent W. Peterson, PE, FASHRAE, LEED AP BD+C, BEAP is the Vice President/Chief Engineer of P2S Engineering Inc. in Long Beach, Calif. Courtesy: P2S Engineering


Michael F. Cooper, PE, LEED AP, Managing Principal, Harley Ellis Devereaux, Southfield, Mich.

Kurt Karnatz, PE, CEM, LEED AP, HBDP, HFDP, President, Environmental Systems Design Inc., Chicago

Kent W. Peterson, PE, FASHRAE, LEED AP BD+C, BEAP, Vice President/Chief Engineer, P2S Engineering Inc., Long Beach, Calif. 

CSE: What’s the one factor most commonly overlooked in electrical systems? 

Cooper: The most overlooked element in electrical systems is planning for the future. We know that once these systems are installed, it’s costly and disruptive to modify or expand them. We also know that changing tenant needs are driving the need for system adaptability. Information technology alone has driven significant changes in electrical systems design. It’s critical that time is taken at the start of each project to assess the needs of today and tomorrow and how today’s systems can help facilitate future growth. 

Karnatz: Power quality. While the total power required on a W/sq ft basis is trending down for office occupancy, the need for power quality and reliability is not. 

CSE: Describe a recent project in which you had complex metering and submetering in a building. 

Karnatz: As previously mentioned, large office buildings with multiple and diverse occupancy needs very often require complex metering schemes. In buildings where there is a great diversity in tenancy and therefore infrastructure consumption, the need to accurately allocate use costs is very important. Very often buildings have some tenants that might consume three to five times the amount of power and cooling that others consume. 

Cooper: One recent project, which achieved a U.S. Green Building Council LEED Platinum Certification, included a building distribution system segregated by load type as well as metering at each tier of the system to for real-time monitoring and management. “Dashboard” displays throughout the facility indicate real-time usage and trending of all utility services. There is truth in the statement, “what gets measured, gets managed.” 

CSE: How do you balance the need for reliable power with the desire for efficiency and sustainability? 

Karnatz: We believe that efficiency, sustainability, and reliability is the three-legged stool of power delivery in an office environment. Depending on tenant enterprise needs, the weighting of the importance of these three elements will vary. 

Cooper: Step one is to understand the level of reliability required by the owner. A computer facility may, for example, have a different need than a general office environment. Once understood, we can then properly evaluate and design power system selective coordination such that impact to system efficiency or sustainability is minimized. The goal is to provide what’s needed in the most efficient way possible. 

CSE: What type of backup or standby power systems have you specified into an office building recently? 

Cooper: Most recently, we have installed parallel natural gas generators (N+1) with rotary UPS systems for critical electrical loads. As our reliance on information technology, Web-based communications, and data management continues to increase, the focus on robust electrical systems and reliable backup provisions will likewise increase. 

Karnatz: We commonly provide backup and standby power through the use of multiple utility feeds, supplementary power generation, and UPS systems. 

No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
HVAC and building envelope: Efficient, effective systems; Designing fire sprinkler systems; Wireless controls in buildings; 2015 Product of the Year winners
2015 MEP Giants: MEP Giants annual report; Mergers and acquisitions; NFPA 2001; Fiber-optic cables; LED specifications
Hospital IAQ: Indoor air quality in health care facilities; NFPA 72; Water use and conservation; Net-zero buildings
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Implementing microgrids: Controlling campus power generation; Understanding cogeneration systems; Evaluating UPS system efficiency; Driving data center PUE, efficiency
Optimizing genset sizing; How the Internet of Things affects the data center; Increasing transformer efficiency; Standby vs. emergency power in mission critical facilities
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.