Data center cooling system

Emerson Network Power's Liebert DSE room-based data center cooling system now includes a 80, 85, and 150 kW units along with the 125 kW unit.

06/05/2013


Emerson Network Power's Liebert DSE room-based data center cooling system now includes a 80, 85, and 150 kW units along with the 125 kW unit. Courtesy: Emerson Network PowerEmerson Network Power announced three new models of the Liebert DSE room-based data center cooling system. The 80, 85, and 150 kW units will join the 125 kW unit. The Liebert DSE features EconoPhase pumped refrigerant economizer that delivers free-cooling without water consumption costs or air contamination concerns. The Liebert DSE with EconoPhase beats the utility cost of traditional air-cooled direct expansion systems by 45% and typical chilled water systems with air economizer systems by 15%, without introducing outside air into the controlled environment. The Liebert DSE also features tandem Copeland Scroll Digital compressors to optimize part-load efficiency, electronic expansion valves to support lower condensing temperatures, and variable speed electrically commutated plug fans that automatically adjust unit airflow to demand. The integrated Liebert iCOM system adds intelligent control capabilities that allow the system to adjust airflow patterns and adapt to changing IT loads. 

Emerson Network Power

www.emersonnetworkpower.com



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Smoke control: Designing for proper ventilation; Smart Grid Standard 201P; Commissioning HVAC systems; Boilers and boiler systems
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.