Cornell University—Stocking Hall Rehabilitation

Addition to existing building: Cornell University—Stocking Hall Rehabilitation; M/E Engineering, P.C.

Source: M/E Engineering, P.C.

08/09/2012


The Stocking Hall high-tech food research lab and dairy processing plant are shown.Project name: Cornell University—Stocking Hall Rehabilitation

Location: Ithaca, N.Y.

Firm name: M/E Engineering, P.C.

Project type, building type: Addition to existing building, research/lab/high-tech

Project duration: 7 years

Project completion date: Nov. 30, 2010

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $25.6 million

Engineering challenges

Working in a campus environment where adjacent structures need to remain operational and be connected to the new building while construction takes place. This poses special challenges from a utility standpoint as well as a LEED standpoint.

Solutions

To meet the U.S. Green Building Council LEED requirements as well as Cornell's energy targets, a very aggressive approach to energy efficiency was taken. A number of strategies were incorporated, which included heat recovery on all the air systems, heat recovery on the water cooled condensing units to aid in the heating of outside air for laboratories, an aggressive demand control ventilation strategy that was utilized in the lab spaces, as well as utilizing relief air to assist with the ventilation of lab spaces and the 250-car parking garage.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity
About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.