SEARCH Archives
Loading
Sponsored by:

Control switch relay

Mitigate arc flash danger in circuit breaker operation with the time delay control switch relay (TD-CSR) from Electroswitch. The switch provides for a manually initiated time-delay trip or close operation that incorporates a flashing LED to notify the operator of a pending trip or close operation and to evacuate the arc flash area.

12/01/2009


 

Mitigate arc flash danger in circuit breaker operation with the time delay control switch relay (TD-CSR) from Electroswitch. The switch provides for a manually initiated time-delay trip or close operation that incorporates a flashing LED to notify the operator of a pending trip or close operation and to evacuate the arc flash area. The TD-CSR meets all the IEEE C37.90 series standards for relay products. The switch relay allows for handling of 30 A/600 V continuous current rating, and the local trip or close capability is initiated and delayed for 10 sec. with an option to cancel the pending trip or close operation.

 

Electroswitch Circle 455

 



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity
About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.