Common Cx roadblocks

There are several mistakes a commissioning agent can make that will create roadblocks in the commissioning process.

06/22/2014


  • Failure to engage the Cx agent early in the project

  • Failure to identify engineering roles

  • Failure to get schedule buy-in from the contractor to align the Cx schedule with construction schedule/delivery date

  • Failure to validate scripts from all parties

  • Lack of experience with current technologies (which might cause confusion in procedure/scripts, resulting in unanticipated downtime and affecting the construction schedule).


Derek DeJesus is the national commissioning manager and electrical commissioning leader for KJWW Engineering Consultants. He supports the company’s commissioning business development, project oversight, and commissioning program.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Water use efficiency: Diminishing water quality, escalating costs; Lowering building energy use; Power for fire pumps
Building envelope and integration; Manufacturing industrial Q&A; NFPA 99; Testing fire systems
Labs and research facilities: Q&A with the experts; Water heating systems; Smart building integration; 40 Under 40 winners
Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.