Albany County Sewer District: Incineration Waste Heat Recovery/Co-Generation Project

Addition to existing building: Albany County Sewer District: Incineration Waste Heat Recovery/Co-Generation Project; CDM Smith

08/09/2012


A cogeneration unit is set in place during construction. Courtesy: CDM Smith (Click to enlarge)Project name: Albany County Sewer District: Incineration Waste Heat Recovery/Co-Generation Project

Location: Menands, N.Y.

Firm name: CDM Smith

Project type, building type: Addition to existing building, manufacturing

Project duration: 4 years

Project completion date: Dec. 1, 2012

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $870,000

Engineering challenges

Issues related to this project included ensuring that the equipment would meet all applicable U.S. standards for the interconnection with the utility, ensuring that the plant personnel were comfortable operating the equipment, and helping the owner secure funding to move the project forward.

Solutions

The CDM-led team was hired to independently evaluate and determine the feasibility of utilizing the high-temperature (1,000 to 1,250 F) exhaust gas flow from the incinerators to an organic rankine cycle system and drive a turbine generator. The CDM team also provided support to the Albany County Sewer District for an application to the New York State Energy Research and Development Authority (NYSERDA), which led to a grant for up to $2 million in engineering and construction funding. Additionally, the CDM team provided support to the district for an application to the New York State Environmental Facilities Corporation (NYSEFC), which led to a $5.8 million in Green Innovation Grant Program (GIGP) funding. Results of the study predict the waste heat from the incinerators is expected to co-generate 3.3 million kWh per year (enough to power 3,000 households); reduce the district’s natural gas consumption by 100,000 therms per year, for a value of $475,000 annually at present rates; and reduce greenhouse gases by 1,445 tons/year. In addition, thermal energy reclaimed will be utilized for space heating, creating a combined heat and power (CHP) system.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Water use efficiency: Diminishing water quality, escalating costs; Lowering building energy use; Power for fire pumps
Building envelope and integration; Manufacturing industrial Q&A; NFPA 99; Testing fire systems
Labs and research facilities: Q&A with the experts; Water heating systems; Smart building integration; 40 Under 40 winners
Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.