1st Army Headquarters Renovation

Existing building retrofit: 1st Army Headquarters Renovation; Pond and Co.

08/09/2012


This photo shows a view of the main lobby of the historic building. (Click to enlarge)Project name: 1st Army Headquarters Renovation

Location: Rock Island, Ill.

Firm name: Pond and Co.

Project type, building type: Existing building retrofit, office

Project duration: 2 years

Project completion date: May 30, 2007

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $181,000

Engineering challenges

The project was challenging in that it involved a complete HVAC and electrical renovation of a 200,000-sq-ft historic building with the most modern and secure global communications systems. The project design also achieved LEED Silver certification. The project budget required that existing mechanical and electrical equipment be reutilized to the greatest extent possible while providing for redundant system requirements due to the nature of the building operations.

Solutions

Pond MEP engineers designed a way to cross-connect existing systems to account for some of the system redundancies that were required, thereby saving approximately $1,000,000 in new equipment costs and the need for a building addition to house the additional equipment. The innovative design required a new direct digital control system to alter the HVAC equipment operations in the event a piece of equipment was down due to failure or for maintenance.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Emergency lighting; NFPA 3 and 4; Integrated building systems; Smart lighting, HVAC design
Designing for energy efficiency; Understanding and applying NFPA 101 for mission critical facilities; Integrating commissioning and testing for fire alarm systems; Optimizing unitary pumping solutions
Economics of HVAC systems; NFPA 110-2016; Designing and choosing modular data centers
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
click me