Advertisement
FREE subscription
Email
Print
Reprint
Learn RSS

Blades spin on Bahrain World Trade Center

-- Consulting-Specifying Engineer, 4/16/2008 6:23:00 AM

Bahrain World Trade Center (BWTC) made history last week as the turbines on this pioneering project turned together for the first time. Three 225-kW wind turbines mounted on the newly built Bahrain World Trade Center spun in unison for the first time on April 8. The achievement was a milestone for the world's first integration of utility-scale wind turbines into a building.

Bahrain World Trade CenterThe three 95-ft.-diameter turbine blades on Bahrain’s iconic landmark are the first in the world to be integrated on such a scale into a commercial development. They are forecast to provide the equivalent  of 11% to 15% of the  power for the two towers when fully operational.

Atkins was commissioned to provide full architectural and building services for the twin towers, a garden court, anchor tenant, and several food outlets as well as a single-storey extension of the BWTC podium to the existing shopping mall. The site for the Bahrain World Trade Center is prestigiously located on the main King Faisal Highway in Manama, Bahrain.

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

By This Author

There are no other articles written by this author.



SPONSORED LINKS

 
Advertisement
Sponsored Links

More Content

  • Blogs

Blogs

Advertisements





NEWSLETTERS
Plug in and get the latest CSE news, trends and industry updates delivered directly to your inbox!

Green Scene
CSE Codes & Standards
CSE NewsWatch
CSE Fire and Life Safety Solutions
CSE Business of Engineering Management Report
CSE Electrical Solutions
CSE HVAC Solutions
Pure Power
CSE Product Showcase
©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites