Isolated Power Systems for Hospitals

By Ramesh Munagala, P.E., Senior Associate - Healthcare, Syska Hennessy, New York -- Consulting-Specifying Engineer, 5/1/2007

Many conflicting opinions prevail regarding isolated power systems (IPS), compounded by the confusion in the interpretation of codes. At the risk of beating a dead horse, I'll add to the discussion.

With the advent of the digital hospital, significant advances in medical technology and the elimination of flammable anesthetics, consulting engineers and hospital personnel are questioning the merits of IPS.

IPS were first mandated by the National Electrical Code (NEC) in the 1950s, for use in patient care areas where flammable anesthetics were used. These areas included operating rooms, intensive care units, coronary care units, cardiac catheterization labs, angiography labs, delivery rooms, dialysis units, and emergency rooms .

An IPS is an unground electrical distribution system. The typical IPS located within an operating room is comprised of a shielded isolation transformer, a line-isolation monitor (LIM), a 2-pole primary circuit breaker and several 2-pole secondary circuit breakers, as specified in NFPA 99 and NEC Article 517. The isolation transformer is most often either a 1:1 or a step-down transformer with the secondary windings not referenced to ground.

The LIM continuously monitors the isolated ungrounded system for any leakage current and activates an audible and visual alarm when the leakage current reaches 5-milliampere (mA), thus alerting the operating room staff. The alarm condition does not mean that hazardous current is flowing, and does not trip the upstream circuit breaker, which could be catastrophic in the event a life-sustaining device is in use. The alarm is just an indication to personnel to take corrective action. The LIM also gives continuous indication of the system's condition (in mA) and is a prediction of the magnitude of the leakage current that could possibly flow from either conductor of the isolated system to ground if a path was provided. A patient's body resistance, which is very low compared to a healthy individual, is susceptible to electric shocks.

With the phasing out of flammable anesthetics in the 1980s, the role of an IPS was reduced. With the advent of the digital hospital, consulting engineers, hospital facilities personnel and medical personnel started questioning the usage of these IPS, which are quite often a maintenance nightmare.

The National Electrical Code does not mandate the usage of IPS, except in wet locations. NFPA 99 defines a wet location as: A patient care area that is subject to wet conditions while patients are present. These include standing fluids on the floor or drenching of the work area, either of which condition is intimate to the patient or staff. Routine housekeeping procedures and incidental spillage of fluids do not define a wet location.

Furthermore, NFPA rules also state that in areas designated as patient care wet locations by the governing body of the facility, all receptacles and fixed equipment shall have ground fault circuit interrupter (GFCI) protection for personnel if interruption of power under fault conditions can be tolerated, or be served by an IPS if such interruption cannot be tolerated.

 

The NEC and Isolated Power Systems

• The National Electrical Code (NEC) mandates isolated power systems in wet locations.

• NEC defines a wet location as one that may have wet conditions when patients are present in a healthcare facility.

• Routine housekeeping procedures and incidental spills are not considered wet locations.

• Areas designated as wet locations shall have ground fault circuit interrupter protection.

Email
Print
Reprint
Learn RSS

Related Content

Related Content

By This Author

There are no other articles written by this author.



SPONSORED LINKS

 
Advertisement
Sponsored Links

More Content

  • Blogs

Blogs

  • Michael Ivanovich
    Give and Take

    March, 25 2008
    Wired on Engineering Education
    Scott Siddens, senior editor, sent me an email yesterday that linked to an article on engineering ed...
    More
  • Michael Ivanovich
    Give and Take

    February, 12 2008
    Reviving the mentor mentality
    Terry Brennan came into the Solar 101 classroom at Utica, N.Y-based Mohawk Valley Community College,...
    More
  • » VIEW ALL BLOGS RSS
Advertisements





NEWSLETTERS
Plug in and get the latest CSE news, trends and industry updates delivered directly to your inbox!

Green Scene
CSE Codes & Standards
CSE NewsWatch
CSE Fire and Life Safety Solutions
CSE Business of Engineering Management Report
CSE Electrical Solutions
CSE HVAC Solutions
Pure Power
CSE Product Showcase
©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites