Advertisement
FREE subscription
Email
Print
Reprint
Learn RSS

Meeting Safety Code Requirements

-- Consulting-Specifying Engineer, 12/1/2000

Close coordination with the authorities having jurisdiction (AHJ) was required in order for work at the Fox Chase Cancer Center to meet local code requirements. Because creation of the bunker was considered new construction by code, a barrier was required to separate chillers from boilers. However, because the existing 450-ton chillers would still be in use and they were in the same room as the site's natural-gas-fired, hot-water boilers, a barrier was not possible. In keeping with the spirit of the code, the AHJs allowed use of refrigerant sensors around the chillers. Boilers were retrofitted with devices that would shut down the burners in case of a refrigerant leak. And finally, a low-end air-quantity fan with a variable-frequency drive was installed to allow an increase in nominal airflow from 20 percent to 100 percent in case of a leak.

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author

There are no other articles written by this author.



SPONSORED LINKS

 
Advertisement
Sponsored Links

More Content

  • Blogs

Blogs


Sorry, no blogs are active for this topic.

» VIEW ALL BLOGS RSS

Advertisements





NEWSLETTERS
Plug in and get the latest CSE news, trends and industry updates delivered directly to your inbox!

Green Scene
CSE Codes & Standards
CSE NewsWatch
CSE Fire and Life Safety Solutions
CSE Business of Engineering Management Report
CSE Electrical Solutions
CSE HVAC Solutions
Pure Power
CSE Product Showcase
©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites