Tale of the Tape
-- Consulting-Specifying Engineer, 12/1/2000
Project: Fox Studios Child Development Center
Location: Los Angeles
Program: Child-care center opening up into an outdoor playground with seven classrooms.
Size: 10,000 square feet
Cost: Confidential
M/E/P Consulting Engineer: Syska & Hennessy, Inc., Los Angeles
Architect: RIOS Associates, Los Angeles
Acoustic Consultants: Veneklasen Associates, Santa Monica, Calif.
General Contractor: Swinerton & Wahlberg, Los Angeles.













